Something went wrong, contact support if you keep getting this message.
cancel
Davy Van Kerschaver
My account
|
Log out
Nuclear-21
Index
Documentation
Help
manual
|
Mail us
Dashboard
Data management
NPP Fleet
NPP Technologies
Fuel Technologies
Fuel Cycle Facilities
Fuel Cycle Inventories
SF Storage Capacity NPP-sites
SF Inventory NPP-Sites
SF Inventory Country
Inventory Waste Country
NPP fuel combination
NPP Fuel Combination History
NPP Type Fuel Combination Options
Scenarios
NES Scenarios
Energy Mix Scenarios
References
Version management
Choose country:
All countries
Algeria
Argentina
Armenia
Australia
Austria
Azerbaijan
Bangladesh
Belarus
Belgium
Botswana
Brazil
Bulgaria
Canada
Central African Republic
Chad
Chile
China
Colombia
Croatia
Cyprus
Czech Republic
Democratic Republic of the Congo
Denmark
Ecuador
Egypt
Estonia
Ethiopia
Finland
France
Gabon
Germany
Ghana
Greece
Greenland
Hong Kong
Hungary
Iceland
India
Indonesia
Iran
Ireland
Israel
Italy
Japan
Jordan
Kazakhstan
Kenya
Kuwait
Kyrgyzstan
Latvia
Lithuania
Luxembourg
Malawi
Malaysia
Mali
Malta
Mauritania
Mexico
Mongolia
Morocco
Namibia
Netherlands
New Zealand
Niger
Nigeria
North Korea
Norway
Pakistan
Paraguay
Peru
Philippines
Poland
Portugal
Qatar
Romania
Russia
Rwanda
Saudi Arabia
Serbia
Singapore
Slovakia
Slovenia
Somalia
South Africa
South Korea
Spain
Sri Lanka
Sudan
Sweden
Switzerland
Syria
Taiwan
Tajikistan
Tanzania
Thailand
Trinidad & Tobago
Tunisia
Turkey
Turkmenistan
United Arab Emirates
Ukraine
United Kingdom
United States
Uzbekistan
Venezuela
Vietnam
World
Zambia
Zimbabwe
EU
Uganda
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
npp
- edit record 1037
Main table: npp
Nearest City:
Country Code:
Data confidence level:
NPP IAEA Code:
Geo Latitude NPP:
License status id:
LI1 License Application
LI2 License Under Review
LI3 Initial License Issued
LI4 Initial License Expiration
LI5 1st License Renewal Application
LI6 1st License Renewal Under Review
LI7 1st License Renewal Issued
LI8 2nd License Renewal Application
LI9 2nd License Renewal Under Review
LI10 2nd License Renewal Issued
LI11 3rd License Renewal Application
LI12 3rd License Renewal Under Review
LI13 3rd License Renewal Issued
LI0 No license status applicable
LifeCycle Status:
Projected/Proposed An NPP has been proposed, but is not yet firmly planned to be built 1
Withdrawn/Cancelled The proposal/plan has been withdrawn or cancelled before construction was started 2
Planned An NPP is firmly planned, and is now moving towards licencing 3
Suspended The plans or licencing process for an NPP are suspended 4
License Application A licence to construct the NPP has been applied for 5
Initial License Process The planned NPP is proceeding through its licencing process 6
License issued A licence has been issued to construct the planned NPP 7
Site preparation works started Work has started to prepare the NPP site, but major earth moving works have not yet begun 8
Excavation work started Major earthworks have started at the construction site 8.1
First nuclear safety-related concrete poured The official start of construction, the pouring of first nuclear-safety related concrete for the NPP 8.2
Equipment installation The start of installation of major components (steam generators, reactor pressure vessel, etc) 8.3
Mothballed during construction Plant construction is suspended and the plant is held in a state where construction may resume 8.4
Cancelled during construction The plant is cancelled after the pouring of first nuclear safety related concrete, without being finished 8.5
Constructed The plant is fully constructed and equipment is installed, but testing has not yet commenced 9
Commissioning The plant is in commissioning in preparation for testing 9.1
Cold hydrostatic testing The plant is undergoing cold, hydrostatic tests as part of commissioning activities 9.2
Cold tests completed Cold, hydrostatic tests have been completed successfully 9.3
Hot functional testing The plant is undergoing hot, functional tests as part of commissioning activities 9.4
Hot tests completed Hot, functional tests have been completed successfully 9.5
First core loading started The first load of fuel is being loaded into the reactor core, prior to start up 9.6
First core loading complete The first load of fuel has been successfully loaded into the core, prior to start up 9.7
First criticality achieved A self-sustaining nuclear chain reaction has been achieved in the reactor 9.8
Mothballed following construction Operations are stopped during commissioning and plant operation is delayed, but not cancelled 9.9
Grid Connection The plant is connected to the off-site electrical grid 10
Commercial operation The plant has begun to operate commercially, and is now considered to be fully operational 11
Extended operation beyond initial design lifetime The plant has passed the end of its initial design lifetime, but is still being operated 11.1
Temporary shutdown The plant is temporarily not operating, but is expected to resume operations at a later date 12
Restarted, not yet in commercial operation The plant has restarted from temporary shutdown, but is not yet operating commercially again 12.1
Permanent Shutdown The plant has been permanently shutdown, and is not expected to return to operation 13
Defuelled pending decommissioning All fuel has been removed from the core of the permanently shutdown reactor 13.1
Under Decommissioning The plant is undergoing decommissioning and deconstruction activities 14
Decommissioned The plant has been fully decommissioned and deconstructed 15
Geo Longitude NPP:
NPP Name:
Npp listings id:
Validated NPP
Prospective NPP
Scenario listed NPP
Archived NPP
Npp technologies id:
AA-I
AA-II
AA-II BWR-2500
AA-III BWR-2500
AA-IV BWR-3000
ABWR
ACP-100
ACPR-1000
ACPR-50S
AFCR
AGR
AM-1
AMB-100
AMB-200
AP-1000
APR-1400
ARC-100
ASTRID
Atmea-1
ATR
AVR
B&W 205
BN-1200
BN-20
BN-350
BN-600
BN-800
BWR
BWR with fossil fuel-fired superheater
BWR with nuclear superheater
BWR-1
BWR-2
BWR-3
BWR-4
BWR-5
BWR-6
BWR-69
BWR-72
BWRX-300
CANDU
CANDU 137 MW
CANDU 200
CANDU 500A
CANDU 500B
CANDU 6
CANDU 750A
CANDU 750B
CANDU 791
CANDU 850
CANDU EC6
CAP-1000
CAP-1400
CAREM Prototype
CFR-600
CNP-1000
CNP-300
CNP-600
Combustion Engineering (2 loop)
CP0
CP1
CP2
CPR-1000
DFR
DPRK GCR
DPRK LWR
EGP-6
EPR
EPR-1750
ESBWR
FBR Prototype
Four Loop
Framatome 3 loop
France CPI
GCR
GE design
Horizontal Pressure Tube Type
HPR-1000
HTGR
HTR-210
HTR-600
HTR-PM
HW BLWR 250
HWGCR
HWGCR 2 loop
IMSR400
KLT-40S
KONVOI
KS 150
KWU (2 loop)
Liquid metal FBR
LMGMR
Lowered Loop
M (2 loop)
M (3 loop)
M (4 loop)
M-310
Magnox
Monju FR
N4 REP 1450
Na-1200
Natural Circulation BWR
NuScale Integral PWR
NYD
OCM
OPR-1000
P4 REP 1300
PBR
PFBR
PFR
PH-250
PHWR
PHWR KWU
PHWR Prototype
PHWR-700
PLWBR
PRE KONVOI
PRISM
PWR
PWR (3 loop)
Raised Loop
RBMK-1000
RBMK-1500
RDE
SGHWR
SMART
SMR-300
SNUPPS
SSR-W
Superheated Steam Reactor
Superheater
System 80
U.S. EPR
UNGG
US-APWR
VVER V-179
VVER V-187
VVER V-210
VVER V-213
VVER V-230
VVER V-270
VVER V-302
VVER V-320
VVER V-338
VVER V-365
VVER V-392B
VVER V-392M
VVER V-412
VVER V-428
VVER V-428M
VVER V-446
VVER V-466B
VVER V-491
VVER V-509
VVER V-510
VVER V-523
VVER-1200
VVER-600
W (1 loop)
W (2 loop)
W (3 loop)
W (4 loop)
WE 212
WE-312
WH 60
WH F
ACP-1000
APWR
BREST-OD-300
VVER V-527
VVER V-528
EPR-1200
EPR-1200
LWR-1000
EU-MSR
LWR-1250
AP-1400
LDR-50 SMR
SMR-150
Primary NPP Category:
FR Fast Spectrum Reactor
GCR Gas Cooled Reactor
HWR Heavy Water Reactor
LWR Light Water Reactor
MSR Molten Salt Reactor
ADS Accelerator Driven System
X Unspecified
NYK Not-Yet-Known
HTR High-Temperature Reactor
Reference Link:
OECD-NEA Nuclear Energy Data - Brown Book OECD-NEA www.oecd-nea.org
IAEA PRIS 2022 IAEA IAEA
IAEA PRIS 2023 IAEA IAEA
Nuclear-21 - Scenarios Update October 2024 Nuclear-21
Secondary NPP Category:
AGR
BWR
CANDU
FMSR
FR
GCR
HTGR
HWGCR
LMGMR
LWGR
MAGNOX/UNGG
OCM
PHWR
PWR
SFR
SGHWR
TMSR
VVER
NYK
FBR
NPP Site:
State/Province:
Sister table: npp_performance_data
Npp availability factor:
Npp elec production:
Npp load factor:
Npp operationfactor:
Npp performance data burnup:
Npp ref gross power:
Npp ref net power:
Npp ref thermal power:
Npp time online:
Reference Link:
Year:
Sister table: npp_key_dates
Npp 1st license expiration date:
Npp 2nd license expiration date:
Npp commercial start date:
Npp commercial start date actual:
Npp commercial start date expected:
Npp commercial start date initial:
Npp construction resumed:
Npp construction start date actual:
Npp construction start date expected:
Npp construction start date initial:
Npp construction suspended:
Npp defined lifetime:
Npp first criticality date actual:
Npp first criticality date expected:
Npp first criticality date initial:
Npp grid connection date actual:
Npp grid connection date expected:
Npp grid connection date initial:
Npp listings id:
Npp long term shutdown end date:
Npp long term shutdown start date:
Npp restart date after shutdown:
Npp shutdown date actual:
Npp shutdown date estimated:
Npp shutdown date expected:
Sister table: npp_owner_history
Npp owner endyear:
Npp owner endyear:
Npp owner startyear:
Npp owner startyear:
Organisations id:
Reference Link:
Sister table: npp_license_history
Date of license status end:
Date of license status start:
License status id:
Reference Link:
Sister table: npp_operator_history
Npp operator endyear:
Npp operator endyear:
Npp operator startyear:
Npp operator startyear:
Organisations id:
Reference Link:
Sister table: npp_owner_history
Npp owner endyear:
Npp owner endyear:
Npp owner startyear:
Npp owner startyear:
Organisations id:
Reference Link:
Sister table: npp_oem_history
Npp oem endyear:
Npp oem startyear:
Organisations id:
Reference Link:
Sister table: npp_architectengineer_history
Npp architectengineer endyear:
Npp architectengineer endyear:
Npp architectengineer startyear:
Npp architectengineer startyear:
Organisations id:
Reference Link:
NPP Fuel combination history
PWR UOX 45 12-4: 12/08/1989 - 08/01/2050 (100)
Information