cancel

Davy Van Kerschaver

My account | Log out

Help

manual | Mail us
Choose country:
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
You can consult all NPP-data or can filter by:
  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

npp detail

You can consult all NPP-data or can filter by:

  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

  page 1/65  
Total number of records: 1616
Id NPP Name NPP Site NPP IAEA Code Npp technologies id State/Province Nearest City Geo Latitude NPP Geo Longitude NPP LifeCycle Status License status id Primary NPP Category Secondary NPP Category Reference Link Country Code Data confidence level Npp listings id
1 Atucha-1 Atucha AR-1 PHWR Prototype Buenos Aires Zarate -33.00 -59.00 Commercial operation LI3 HWR PHWR 0 AR 1.00 Validated NPP
2 Atucha-2 Atucha AR-3 PHWR Prototype Buenos Aires Zarate -33.00 -59.00 Commercial operation LI3 HWR PHWR 0 AR 1.00 Validated NPP
3 Atucha-3 Atucha AR-? CANDU EC6 Buenos Aires Zarate -33.00 -59.00 License issued LI3 HWR CANDU 0 AR 0.00 Validated NPP
4 Atucha-4 Atucha AR-? HTGR Buenos Aires Zarate -33.00 -59.00 Planned 0 LWR PWR 0 AR 0.00 Validated NPP
5 CAREM25 Atucha AR-4 CAREM Prototype Buenos Aires Zarate -33.00 -59.00 First nuclear safety-related concrete poured LI3 LWR PWR 0 AR 0.00 Validated NPP
6 Embalse Embalse AR-2 CANDU 6 Córdoba Embalse -32.00 -64.00 Commercial operation LI3 HWR CANDU 0 AR 1.00 Validated NPP
7 Armenian-1 Armenia AM-18 VVER V-302 Armavir Vagharshapat 40.00 44.00 Permanent Shutdown LI3 LWR VVER 0 AM 1.00 Validated NPP
8 Armenian-2 Armenia AM-19 VVER V-302 Armavir Vagharshapat 40.00 44.00 Commercial operation LI3 LWR VVER 0 AM 1.00 Validated NPP
9 Armenian-3 Armenia AM-?? W (1 loop) Armavir Vagharshapat 40.00 44.00 Projected/Proposed 0 LWR VVER 0 AM 0.00 Prospective NPP
10 Rooppur-1 Rooppur BA-?? VVER-1200 Pabna Pabna 24.00 89.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BD 0.00 Validated NPP
11 Rooppur-2 Rooppur BA-?? VVER-1200 Pabna Pabna 24.00 89.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BD 0.00 Validated NPP
12 Belarusian/Ostrovets-1 Belarusian BY-1 VVER V-509 Grodno Ostrovets 54.00 26.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BY 0.00 Validated NPP
13 Belarusian/Ostrovets-2 Belarusian BY-2 VVER V-509 Grodno Ostrovets 54.00 26.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BY 0.00 Validated NPP
14 Belarusian/Ostrovets-3 Belarusian BY-3 VVER V-509 Grodno Ostrovets 54.00 26.00 Projected/Proposed 0 LWR VVER 0 BY 0.00 Prospective NPP
15 Belarusian/Ostrovets-4 Belarusian BY-4 VVER V-509 Grodno Ostrovets 54.00 26.00 Projected/Proposed 0 LWR VVER 0 BY 0.00 Prospective NPP
16 BR-3 Mol BE-1 PWR (3 loop) Antwerpen Mol 51.00 5.00 Permanent Shutdown LI3 LWR PWR 0 BE 1.00 Validated NPP
17 Doel-1 Doel BE-2 W (3 loop) Oost-Vlaanderen Doel 51.00 4.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
18 Doel-2 Doel BE-4 W (3 loop) Oost-Vlaanderen Doel 51.00 4.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
19 Doel-3 Doel BE-5 W (4 loop) Oost-Vlaanderen Doel 51.00 4.00 Temporary shutdown LI3 LWR PWR 0 BE 1.00 Validated NPP
20 Doel-4 Doel BE-7 W (4 loop) Oost-Vlaanderen Doel 51.00 4.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
21 Doel-5 Doel BE-?? N4 REP 1450 Oost-Vlaanderen Doel 51.00 4.00 Cancelled during construction LI3 LWR PWR 0 BE 0.00 Validated NPP
22 Tihange-1 Tihange BE-3 France CPI Namen Tihange 50.00 5.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
23 Tihange-2 Tihange BE-6 W (4 loop) Namen Tihange 50.00 5.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
24 Tihange-3 Tihange BE-8 W (4 loop) Namen Tihange 50.00 5.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
25 Angra-1 Angra BR-1 W (3 loop) Rio de Janeiro Angro dos Reis -23.00 -44.00 Commercial operation LI3 LWR PWR 0 BR 1.00 Validated NPP