cancel

Davy Van Kerschaver

My account | Log out

Help

manual | Mail us
Choose country:
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
You can consult all NPP-data or can filter by:
  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

npp detail

You can consult all NPP-data or can filter by:

  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

  page 1/65  
Total number of records: 1616
Id NPP Name NPP Site NPP IAEA Code Npp technologies id State/Province Nearest City Geo Latitude NPP Geo Longitude NPP LifeCycle Status License status id Primary NPP Category Secondary NPP Category Reference Link Country Code Data confidence level Npp listings id
1539 1 1 AA-III BWR-2500 2 1539 0.00 0.00 0 0 LWR BWR Nuclear-21 - Scenarios Update October 2024 0.00 0
1386 BARAKAH-3 BARAKAH AE-03 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Grid Connection LI3 LWR PWR AE 1.00
1385 BARAKAH-4 BARAKAH AE-04 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Projected/Proposed LI1 LWR PWR AE 1.00
862 Barakah-4 Barakah AE-04 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Equipment installation LI3 LWR PWR 0 AE 0.00 Validated NPP
861 Barakah-3 Barakah AE-03 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Equipment installation LI3 LWR PWR 0 AE 0.00 Validated NPP
860 Barakah-2 Barakah AE-02 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Hot tests completed LI3 LWR PWR 0 AE 1.00 Validated NPP
859 Barakah-1 Barakah AE-01 APR-1400 Abu Dhabi Abu Dhabi 23.00 52.00 Hot tests completed LI3 LWR PWR 0 AE 1.00 Validated NPP
7 Armenian-1 Armenia AM-18 VVER V-302 Armavir Vagharshapat 40.00 44.00 Permanent Shutdown LI3 LWR VVER 0 AM 1.00 Validated NPP
8 Armenian-2 Armenia AM-19 VVER V-302 Armavir Vagharshapat 40.00 44.00 Commercial operation LI3 LWR VVER 0 AM 1.00 Validated NPP
9 Armenian-3 Armenia AM-?? W (1 loop) Armavir Vagharshapat 40.00 44.00 Projected/Proposed 0 LWR VVER 0 AM 0.00 Prospective NPP
2 Atucha-2 Atucha AR-3 PHWR Prototype Buenos Aires Zarate -33.00 -59.00 Commercial operation LI3 HWR PHWR 0 AR 1.00 Validated NPP
3 Atucha-3 Atucha AR-? CANDU EC6 Buenos Aires Zarate -33.00 -59.00 License issued LI3 HWR CANDU 0 AR 0.00 Validated NPP
4 Atucha-4 Atucha AR-? HTGR Buenos Aires Zarate -33.00 -59.00 Planned 0 LWR PWR 0 AR 0.00 Validated NPP
5 CAREM25 Atucha AR-4 CAREM Prototype Buenos Aires Zarate -33.00 -59.00 First nuclear safety-related concrete poured LI3 LWR PWR 0 AR 0.00 Validated NPP
6 Embalse Embalse AR-2 CANDU 6 Córdoba Embalse -32.00 -64.00 Commercial operation LI3 HWR CANDU 0 AR 1.00 Validated NPP
1 Atucha-1 Atucha AR-1 PHWR Prototype Buenos Aires Zarate -33.00 -59.00 Commercial operation LI3 HWR PHWR 0 AR 1.00 Validated NPP
1298 CAREM25 CAREM25 AR-4 CAREM Prototype 0.00 0.00 Projected/Proposed LI1 LWR PWR AR 1.00
1368 ROOPPUR-1 ROOPPUR BD-1 VVER V-523 0.00 0.00 Projected/Proposed LI1 NYK PWR BD 1.00
1367 ROOPPUR-2 ROOPPUR BD-2 VVER V-523 0.00 0.00 Projected/Proposed LI1 NYK PWR BD 1.00
11 Rooppur-2 Rooppur BA-?? VVER-1200 Pabna Pabna 24.00 89.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BD 0.00 Validated NPP
10 Rooppur-1 Rooppur BA-?? VVER-1200 Pabna Pabna 24.00 89.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 BD 0.00 Validated NPP
17 Doel-1 Doel BE-2 W (3 loop) Oost-Vlaanderen Doel 51.00 4.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP
21 Doel-5 Doel BE-?? N4 REP 1450 Oost-Vlaanderen Doel 51.00 4.00 Cancelled during construction LI3 LWR PWR 0 BE 0.00 Validated NPP
16 BR-3 Mol BE-1 PWR (3 loop) Antwerpen Mol 51.00 5.00 Permanent Shutdown LI3 LWR PWR 0 BE 1.00 Validated NPP
20 Doel-4 Doel BE-7 W (4 loop) Oost-Vlaanderen Doel 51.00 4.00 Commercial operation LI3 LWR PWR 0 BE 1.00 Validated NPP