cancel

Davy Van Kerschaver

My account | Log out

Help

manual | Mail us
Choose country:
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
You can consult all NPP-data or can filter by:
  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

npp detail

You can consult all NPP-data or can filter by:

  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

  page 1/65  
Total number of records: 1616
Nearest City Country Code Data confidence level NPP IAEA Code Id Geo Latitude NPP License status id LifeCycle Status Geo Longitude NPP NPP Name Npp listings id Npp technologies id Primary NPP Category Reference Link Secondary NPP Category NPP Site State/Province
1 Zarate AR 1.00 AR-1 -33.00 LI3 Commercial operation -59.00 Atucha-1 Validated NPP PHWR Prototype HWR 0 PHWR Atucha Buenos Aires
2 Zarate AR 1.00 AR-3 -33.00 LI3 Commercial operation -59.00 Atucha-2 Validated NPP PHWR Prototype HWR 0 PHWR Atucha Buenos Aires
3 Zarate AR 0.00 AR-? -33.00 LI3 License issued -59.00 Atucha-3 Validated NPP CANDU EC6 HWR 0 CANDU Atucha Buenos Aires
4 Zarate AR 0.00 AR-? -33.00 0 Planned -59.00 Atucha-4 Validated NPP HTGR LWR 0 PWR Atucha Buenos Aires
5 Zarate AR 0.00 AR-4 -33.00 LI3 First nuclear safety-related concrete poured -59.00 CAREM25 Validated NPP CAREM Prototype LWR 0 PWR Atucha Buenos Aires
6 Embalse AR 1.00 AR-2 -32.00 LI3 Commercial operation -64.00 Embalse Validated NPP CANDU 6 HWR 0 CANDU Embalse Córdoba
7 Vagharshapat AM 1.00 AM-18 40.00 LI3 Permanent Shutdown 44.00 Armenian-1 Validated NPP VVER V-302 LWR 0 VVER Armenia Armavir
8 Vagharshapat AM 1.00 AM-19 40.00 LI3 Commercial operation 44.00 Armenian-2 Validated NPP VVER V-302 LWR 0 VVER Armenia Armavir
9 Vagharshapat AM 0.00 AM-?? 40.00 0 Projected/Proposed 44.00 Armenian-3 Prospective NPP W (1 loop) LWR 0 VVER Armenia Armavir
10 Pabna BD 0.00 BA-?? 24.00 LI3 First nuclear safety-related concrete poured 89.00 Rooppur-1 Validated NPP VVER-1200 LWR 0 VVER Rooppur Pabna
11 Pabna BD 0.00 BA-?? 24.00 LI3 First nuclear safety-related concrete poured 89.00 Rooppur-2 Validated NPP VVER-1200 LWR 0 VVER Rooppur Pabna
12 Ostrovets BY 0.00 BY-1 54.00 LI3 First nuclear safety-related concrete poured 26.00 Belarusian/Ostrovets-1 Validated NPP VVER V-509 LWR 0 VVER Belarusian Grodno
13 Ostrovets BY 0.00 BY-2 54.00 LI3 First nuclear safety-related concrete poured 26.00 Belarusian/Ostrovets-2 Validated NPP VVER V-509 LWR 0 VVER Belarusian Grodno
14 Ostrovets BY 0.00 BY-3 54.00 0 Projected/Proposed 26.00 Belarusian/Ostrovets-3 Prospective NPP VVER V-509 LWR 0 VVER Belarusian Grodno
15 Ostrovets BY 0.00 BY-4 54.00 0 Projected/Proposed 26.00 Belarusian/Ostrovets-4 Prospective NPP VVER V-509 LWR 0 VVER Belarusian Grodno
16 Mol BE 1.00 BE-1 51.00 LI3 Permanent Shutdown 5.00 BR-3 Validated NPP PWR (3 loop) LWR 0 PWR Mol Antwerpen
17 Doel BE 1.00 BE-2 51.00 LI3 Commercial operation 4.00 Doel-1 Validated NPP W (3 loop) LWR 0 PWR Doel Oost-Vlaanderen
18 Doel BE 1.00 BE-4 51.00 LI3 Commercial operation 4.00 Doel-2 Validated NPP W (3 loop) LWR 0 PWR Doel Oost-Vlaanderen
19 Doel BE 1.00 BE-5 51.00 LI3 Temporary shutdown 4.00 Doel-3 Validated NPP W (4 loop) LWR 0 PWR Doel Oost-Vlaanderen
20 Doel BE 1.00 BE-7 51.00 LI3 Commercial operation 4.00 Doel-4 Validated NPP W (4 loop) LWR 0 PWR Doel Oost-Vlaanderen
21 Doel BE 0.00 BE-?? 51.00 LI3 Cancelled during construction 4.00 Doel-5 Validated NPP N4 REP 1450 LWR 0 PWR Doel Oost-Vlaanderen
22 Tihange BE 1.00 BE-3 50.00 LI3 Commercial operation 5.00 Tihange-1 Validated NPP France CPI LWR 0 PWR Tihange Namen
23 Tihange BE 1.00 BE-6 50.00 LI3 Commercial operation 5.00 Tihange-2 Validated NPP W (4 loop) LWR 0 PWR Tihange Namen
24 Tihange BE 1.00 BE-8 50.00 LI3 Commercial operation 5.00 Tihange-3 Validated NPP W (4 loop) LWR 0 PWR Tihange Namen
25 Angro dos Reis BR 1.00 BR-1 -23.00 LI3 Commercial operation -44.00 Angra-1 Validated NPP W (3 loop) LWR 0 PWR Angra Rio de Janeiro