cancel

Davy Van Kerschaver

My account | Log out

Help

manual | Mail us
Choose country:
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
You can consult all NPP-data or can filter by:
  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

npp detail

You can consult all NPP-data or can filter by:

  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP-record allows you to consult all details about the specific NPP and to annotate and update/change data for the selected NPP. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

  page 1/65  
Total number of records: 1616
Id NPP Name NPP Site NPP IAEA Code Npp technologies id State/Province Nearest City Geo Latitude NPP Geo Longitude NPP LifeCycle Status License status id Primary NPP Category Secondary NPP Category Reference Link Country Code Data confidence level Npp listings id
1539 1 1 AA-III BWR-2500 2 1539 0.00 0.00 0 0 LWR BWR Nuclear-21 - Scenarios Update October 2024 0.00 0
816 Agesta Agesta SE-1 PHWR KWU Stockholm Huddinge 59.00 18.00 Permanent Shutdown LI3 HWR PHWR 0 SE 1.00 Validated NPP
693 Akademik Lomonosov-1 Pevek RU-151 KONVOI Chukotka Anadyr 69.00 170.00 First core loading complete LI3 LWR PWR 0 RU 1.00 Validated NPP
694 Akademik Lomonosov-2 Pevek RU-152 KONVOI Chukotka Anadyr 69.00 170.00 First core loading complete LI3 LWR PWR 0 RU 1.00 Validated NPP
1369 AKKUYU-1 AKKUYU TR-1 VVER V-509 0.00 0.00 Projected/Proposed LI1 NYK PWR TR 1.00
843 Akkuyu-1 Akkuyu TU-?? VVER V-510 Mersin Mersin 36.00 33.00 First nuclear safety-related concrete poured LI3 LWR VVER 0 TR 0.00 Validated NPP
844 Akkuyu-2 Akkuyu TU-?? VVER V-510 Mersin Mersin 36.00 33.00 Planned 0 LWR VVER 0 TR 0.00 Validated NPP
1373 AKKUYU-2 AKKUYU TR-2 VVER V-509 0.00 0.00 Projected/Proposed LI1 NYK PWR TR 1.00
845 Akkuyu-3 Akkuyu TU-?? VVER V-510 Mersin Mersin 36.00 33.00 Planned 0 LWR VVER 0 TR 0.00 Validated NPP
1372 AKKUYU-3 AKKUYU TR-3 VVER V-509 0.00 0.00 Projected/Proposed LI1 NYK PWR TR 1.00
1155 AKKUYU-4 TR-4 VVER V-509 0.00 0.00 Site preparation works started LI3 NYK PWR TR 1.00
846 Akkuyu-4 Akkuyu TU-?? VVER V-510 Mersin Mersin 36.00 33.00 Planned 0 LWR VVER 0 TR 0.00 Validated NPP
1371 AKKUYU-4 AKKUYU TR-4 VVER V-509 0.00 0.00 Projected/Proposed LI1 NYK PWR TR 1.00
650 Aktau Almaty KZ-10 BN-350 Almaty Alatau 43.00 77.00 Permanent Shutdown LI3 FR SFR 0 KZ 1.00 Validated NPP
664 Akwa Iborn-1 Akwa Iborn NG-?? OCM Akwa Iborn Eket 4.00 7.00 Projected/Proposed 0 LWR PWR 0 NG 0.00 Prospective NPP
665 Akwa Iborn-2 Akwa Iborn NG-?? OCM Akwa Iborn Eket 4.00 7.00 Projected/Proposed 0 LWR PWR 0 NG 0.00 Prospective NPP
799 Almaraz-1 Almaraz ES-6 W (4 loop) Caceras Almaraz 39.00 -5.00 Commercial operation LI3 LWR PWR 0 ES 1.00 Validated NPP
800 Almaraz-2 Almaraz ES-7 W (4 loop) Caceras Almaraz 39.00 -5.00 Commercial operation LI3 LWR PWR 0 ES 1.00 Validated NPP
25 Angra-1 Angra BR-1 W (3 loop) Rio de Janeiro Angro dos Reis -23.00 -44.00 Commercial operation LI3 LWR PWR 0 BR 1.00 Validated NPP
26 Angra-2 Angra BR-2 PRISM Rio de Janeiro Angro dos Reis -23.00 -44.00 Commercial operation LI3 LWR PWR 0 BR 1.00 Validated NPP
1366 ANGRA-3 ANGRA BR-3 PRE KONVOI 0.00 0.00 Projected/Proposed LI1 LWR PWR BR 1.00
27 Angra-3 Angra BR-3 PRISM Rio de Janeiro Angro dos Reis -23.00 -44.00 Site preparation works started LI3 LWR PWR 0 BR 0.00 Validated NPP
950 ANO-1 ANO US-313 M (2 loop) AR London 35.00 -93.00 Commercial operation LI7 LWR PWR 0 US 1.00 Validated NPP
951 ANO-2 ANO US-368 Combustion Engineering (2 loop) AR London 35.00 -93.00 Commercial operation LI7 LWR PWR 0 US 1.00 Validated NPP
695 APS-1 Obninsk Obninsk RU-1 AM-1 Kaluga Oblast Obninsk 55.00 36.00 Permanent Shutdown LI3 LWR LWGR 0 RU 1.00 Validated NPP