cancel

Davy Van Kerschaver

My account | Log out

Help

manual | Mail us
Choose country:
= delete record
= edit record
= check record
= edit data records
= uncheck/revert record
= open excel file
= start calculation
= calculations done
You can consult all NPP Technology data or can filter by:
  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP Technology record allows you to consult all details about the specific NPP Technology and to annotate and update/change data for the selected NPP Technology. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

npp_technologies detail

You can consult all NPP Technology data or can filter by:

  • Selecting the country in the top bar
  • Or perform more specific queries in the database via the query-form
The pencil next to the specific NPP Technology record allows you to consult all details about the specific NPP Technology and to annotate and update/change data for the selected NPP Technology. Remind that your changes will not be implemented directly though goes through a review process before being published in the next NucInfo-database version.

  page 1/8  
Total number of records: 178
Id Name NPP Technology Name NPP Technology Description NPP Generation NucInfo ID NPP Primary Category NucInfo ID NPP Secondary Category NucInfo ID NPP Technology Design Thermal Capacity NPP Technology Design Gross Electric NPP Technology Design Net Electric NPP Technology Desing Load Factor NPP Technology Desing Capacity Factor NPP Technology Desing Availability Factor NPP Technology Design Technical Lifetime NPP Technology Design Core HM Mass NPP Technology Readiness Level Reference Link NPP Technology Design Fuel 23U Enrichment NPP Technology Design Number Core Batches NPP Technology Design Cycle Length NPP Technology Design Fuel BU NPP Technology Desing Thermal Efficiency
1 AA-I 2 LWR BWR 1957.50 701.00 678.00 90 90 90.00 60.00 0.00 4.20 3.00 18.00 45.00 34.64
2 AA-II 2 LWR BWR 1800.00 630.33 612.67 90 90 90.00 60.00 0.00 4.20 3.00 18.00 45.00 34.04
3 AA-II BWR-2500 2 LWR BWR 2500.00 910.00 885.00 90 90 90.00 60.00 0.00 4.20 3.00 18.00 45.00 35.40
4 AA-III BWR-2500 2 LWR BWR 3090.50 1090.00 1052.00 90 90 90.00 60.00 0.00 4.20 3.00 18.00 45.00 34.04
5 AA-IV BWR-3000 2 LWR BWR 3600.00 1331.00 1283.50 90 90 90.00 60.00 0.00 4.20 3.00 18.00 45.00 35.65
6 ABWR 3 LWR BWR 4041.37 1373.37 1322.95 90 90 90.00 60.00 0.00 4.00 3.00 24.00 45.00 32.74
7 ACP-100 3 LWR PWR 325.00 121.00 100.00 90 90 90.00 60.00 0.00 4.28 3.00 24.00 50.00 30.77
166 ACP-1000 3 LWR PWR 3091.00 1210.00 1000.00 90 90 90.00 60.00 0.00 4.28 3.00 24.00 50.00 32.35
8 ACPR-1000 3 LWR PWR 2905.00 1083.50 1000.00 90 90 90.00 60.00 0.00 4.25 3.00 18.00 50.00 34.42
9 ACPR-50S 3 LWR PWR 200.00 60.00 55.00 90 90 90.00 40.00 0.00 4.50 3.00 30.00 45.00 27.50
10 AFCR 3 HWR CANDU 2180.00 706.00 650.00 90 90 90.00 50.00 0.00 0.71 5.00 8.00 7.50 29.82
11 AGR 2 GCR AGR 1429.73 609.87 516.27 90 90 90.00 40.00 0.00 2.70 3.00 12.00 18.00 36.11
12 AM-1 1 LWR LWGR 30.00 6.00 5.00 85 85 85.00 40.00 0.00 5.00 3.00 18.00 20.00 16.67
13 AMB-100 1 LWR LWGR 286.00 108.00 102.00 85 85 85.00 40.00 0.00 1.80 3.00 18.00 20.00 35.66
14 AMB-200 1 LWR LWGR 530.00 160.00 146.00 85 85 85.00 40.00 0.00 3.00 3.00 18.00 20.00 27.55
15 AP-1000 4 LWR PWR 3411.57 1250.00 1098.29 90 90 90.00 60.00 0.00 4.80 4.00 18.00 50.00 32.19
185 AP-1400 AP-1400 3 LWR PWR 3650.00 1400.00 1380.00 85 90 85.00 80.00 0.00 0.00 0.00 0.00 0.00 38.36
16 APR-1400 4 LWR PWR 3965.50 1414.17 1325.89 90 90 90.00 60.00 0.00 4.80 4.00 18.00 50.00 33.44
167 APWR 3 LWR PWR 4041.37 1373.37 1322.95 90 90 90.00 60.00 0.00 4.00 3.00 24.00 45.00 32.74
17 ARC-100 4 FR SFR 100.00 260.00 38.46 90 90 90.00 60.00 0.00 15.00 1.00 240.00 80.00 38.46
18 ASTRID 5 FR SFR 360.00 162.00 150.00 85 85 85.00 40.00 0.00 23.00 5.00 8.00 100.00 41.67
19 Atmea-1 3 LWR PWR 3150.00 1150.00 1100.00 90 90 90.00 60.00 0.00 4.95 4.00 18.00 50.00 34.92
20 ATR 2 HWR SGHWR 557.00 165.00 148.00 50 50 50.00 30.00 0.00 1.70 3.00 18.00 25.00 26.57
21 AVR 1 GCR HTGR 46.00 15.00 13.00 85 85 85.00 60.00 0.00 93.00 8.00 8.00 80.00 28.26
22 B&W 205 2 LWR PWR 3760.00 1302.00 1219.00 90 90 90.00 60.00 0.00 4.45 3.00 18.00 50.00 32.42